2) An operator is going to buy a grain drill. The choices available are: 10, 20, or 30 foot.
Field efficiency is 70% for the 10 foot and 20 foot drill, and 65% for the 30 foot drill. Speed would be 6 mph for all three. Suppose the operator wants to be able to cover 400 acres in 3 days and can work at this task 12 hours per day.
a) Calculate the minimum capacity needed.
b) Now calculate field capacity for the three grain drill sizes.
c) What is the minimum size grain drill that will meet this target?
d) Suppose the operator can allocate 4 days to this task. What is the minimum size drill that would accomplish that goal?
e) If the operator was willing to work only 10 hours per day, what is the minimum required field capacity?
Show more
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more